배전계통에서 리클로져-퓨즈 협조동작시 초전도한류기 적용에 의한 순간전압강하 분석에 관한 연구

Citations

SCOPUS

0

초록

This paper analyzed bus voltage sag caused by recloser-fuse coordination in a power distribution system with SFCL. Generally, the recloser is installed to upstream of fuse to clear against both permanent and temporary faults appropriately, when the fault happened and to block expansion of the fault area. Futhermore, when the fault occurred, bus voltage sag is caused by increased fault currents. However, in a power distribution system with SFCL, the fault current could be decreased by the effect of the impedance value of the SFCL and place to install one as long as it could improve bus voltage sag. Therefore, to analyze the effect of the improvement of bus voltage sag caused by recloser-fuse coordination in a power distribution system with SFCL, we used PSCAD/EMTDC about a permanent fault at the place behind the fuse.

키워드

Recloser-Fuse coordinationvoltage sagpower distribution systemsuperconducting fault current limiter.
제목
배전계통에서 리클로져-퓨즈 협조동작시 초전도한류기 적용에 의한 순간전압강하 분석에 관한 연구
저자
김명후김진석유일경왕순욱문종필임성훈김재철
발행일
2010-03
유형
Article
저널명
한국초전도.저온논문지
12
1
페이지
22 ~ 27