자원 제약을 고려한 일정 문제 - 활동 진행중 재작업이 가능한 경우 -

Resource Constrained Project Scheduling Problem - Case with Possible Rework while Activity -
  • 이두희; 
  • 백인섭; 
  • 김승겸; 
  • 안태호

초록

Activity requires to be performed again given the performance of project. This repetition of work is called rework. It is previously considered to occur upon completion of activity; however, due to the fact that changes in requirements in the project cause the occurrence time of rework vary from the beginning to the end. Thus, model and algorism to apply for the activity need to be developed. In this research, among SRCPSP (Stochastic Resource Constrained Project Scheduling Problem), statistical model of RCPSP (Resource Constrained Project Scheduling Problem) typical project scheduling problem, the method which when the period of activity acts as probability variable, expected value and multiplier of the unexpected value is used for estimation. Along with the method, a mathematical model, which shows rework can occur at arbitrary point, is developed and has proven its validity through simulated tests with applicable algorism. This research is significant because of extended experimental period of activity from the beginning to the end along with the distinguished means of the mathematical model which the period of rework is estimated via the expected value and multiplier of the value.

키워드

프로젝트일정관리; 프로젝트 불확실성; 프로젝트 활동기간; Project Scheduling; Project Uncertainty; Project Duration
제목
자원 제약을 고려한 일정 문제 - 활동 진행중 재작업이 가능한 경우 -
제목 (타언어)
Resource Constrained Project Scheduling Problem - Case with Possible Rework while Activity -
저자
이두희; 백인섭; 김승겸; 안태호
발행일
2021-09
저널명
서비스경영학회지
권
22
호
3
페이지
278 ~ 303