상세 보기
Study on ESS operation plan for energy reduction in industrial customer
산업용 수용가에서 에너지절감을 위한 ESS 운영 방안에 관한 연구
- Yu, S.-J.;
- Lee, A.-G.;
- Baek, J.-S.;
- Cha, D.-J.;
- KIm, J.-C.
Citations
SCOPUS
1초록
In this paper, Optimal operation plan through load analysis of industrial end-user is suggested. It calculated economic feasibility of ESS with detailed power lad analysis and conditions. Generally, if the latest maximum power is less than 30% of contracted power, it can not be peak shaving operation plan. and if the peak load level stays stead for 24 hours, it is difficult peak shaving for ESS. In addition to, When the peak load is occurred in summer or winter, a hybrid operation method combining the peak shaving plan and the time shift method is proposed. Therefore, When ESS is installed in industrial electrical customer, it is achieved best effect through the optimal operation plan.
키워드
Discount system; Electric charges; ESS; Optimal operation; Peak shaving; Time shift
- 제목
- Study on ESS operation plan for energy reduction in industrial customer
- 제목 (타언어)
- 산업용 수용가에서 에너지절감을 위한 ESS 운영 방안에 관한 연구
- 저자
- Yu, S.-J.; Lee, A.-G.; Baek, J.-S.; Cha, D.-J.; KIm, J.-C.
- 발행일
- 2018-09
- 유형
- Article
- 저널명
- 전기학회논문지
- 권
- 67
- 호
- 9
- 페이지
- 1152 ~ 1158
- 언어
- KOR
- 출판사
- Korean Institute of Electrical Engineers elecjour@kiee.or.kr
- 발행국가
- 대한민국
- 분량
- 7 페이지
- ISSN
- E 2287-4364
P 1975-8359